Customer - VSIA "Riga Tourism and Creative Industry Technical School"
Customer - Smiltene County Council
Customer - Salaspils district council
Customer - Riga International Airport
Customer - Medozoli, Ltd
Customer - Mierupe, Ltd
Customer - Preili municipality council
Customer - Saulkrasti municipality council
Customer - Lielvarde region council
Customer - Burtnieki region Council
Customer: Sejas region Council
Customer: LLC “Medozoli”
Customer: "Laktes", Ltd
Road Construction, Construction of the stormwater drainage networks, Construction of the water drainage networks, Construction of Gas supply network, Construction of Low-voltage networks.
Customer: Salaspils region Council
Customer: Olaine region local government
Conducted by: Association of persons LLC "Fixman" and LLC "Buildimpeks"
Customer: Riga Ziemeļu, Austrumu and Pārdaugava executive Boards
Customer: LLC “Sapņu ciemats”
Customer: LLC “IMG Constructor”
- Dismantling and stairs installation works at the central entrance and tennis courts,
- Rain sewer system construction works
- Installation of granite plates
Customer: LLC “Medozoli”
Customer: Adazi County council
Road construction, cobbling, construction of culverts and trenching.
Customer: "Mierupe", Ltd.
Construction
of the water drainage networks, drainage
networks and road construction, asphalt paving.
Customer: "Laktes", Ltd
Road Construction, Construction of the stormwater drainage networks, Construction of the water drainage networks, Construction of Gas supply network, Construction of Low-voltage networks.
Landscaping
and installation of household sewage system, external heating installation
works in hotel
Customer: "IMG Constructor", Ltd
Customer - Saulkrasti County Council
General contractor - JSC BUILDIMPEKS
The works were commenced in October 2015, commissioned in November 2015. The main construction works - engineering, asphalt, basketball and hockey field construction.
Customer - COP Latvia
General contractor - SIA Merks
The works were commenced in August 2015, to be commissioned in June 2016. The main construction works - soil development, engineering systems, infrastructure development - asphalt, paving.
Customer - JSC "Jūrmalas slimnīca"
General contractor - JSC BUILDIMPEKS
The works were commenced in September 2015, commissioned in November 2015. The main construction work - engineering systems, paving stone decking.
Customer - Riga City Council, Planning, Procurement and Control Unit
General contractor - JSC BUILDIMPEKS
The works were commenced in July 2015, commissioned in November 2015. The main types of construction works - resurfacing with cobblestone pavement.
Customer - Marupe Parish Council
General contractor - JSC BUILDIMPEKS
The works were commenced in June 2015, commissioned in November 2015. The main construction works - soil development, engineering systems, infrastructure development - asphalt covering and paving - artificial rubber paver decking.Customer - Saulkrasti County Council
General contractor - JSC BUILDIMPEKS
The works were commenced in June 2014, commissioned in November 2014. The main works - dismantling of the tribunes, soil development, engineering, development of infrastructure - asphalt, paving and laying of an artificial football coverage.
Customer - Riga Pardaugava Executive Board
General contractor - JSC BUILDIMPEKS
The works were commenced in June 2014, commissioned in October 2014. The main types of works - resurfacing with cobblestone pavement.
Commissioning party - “Riga International Airport”, general contractor - “MERKS” LTD. We started to work in December 2013; the delivery - in June 2014. The main types of construction works – dismantling, earthworks, engineer networks and laying asphalt.
Customer - JSC Rainis
General contractor - JSC BUILDIMPEKS
The works were commenced in April 2012, commissioned in August 2013. The main types of construction - demolition, soil development, engineering, infrastructure.
Commissioning party – Dwelling and Environmental Department of Riga City Council. The main task was to ensure city water-supply system for the residents of Sila Street and Granita Street. The works were carried out within a short period of time, because Buildimpeks undertook the responsibility to connect the water-supply system by the end of 2013.
General contractor – “MERKS” LTD. The main construction works we performed were excavation and laying cobblestones.